- Home
- Departments & Offices
- Operations, Enterprise Services, and Facilities
- Measure HH
- Project Information
- project_profiles
- Emergency Communication System Upgrade
Emergency Communication System Upgrade
Project Schedule
| Programming Complete | Design and DSA Approval | Construction Completion (Est.) | FFE and Move-In (Est.) |
|---|---|---|---|
| 01-2026 | N/A | TBD | N/A |
Current Status/Phase: Pre-Construction
Project Insights
Upcoming Milestones:
- 95% Construction Documents received in May 2026
- Budgetary ROM estimate anticipated by the end of May 2026
- Multiple scope overview meetings were held with campus teams in June 2026 to present the Emergency Communication System (ECS) project scope. The meetings provided stakeholders with an opportunity to review the proposed improvements and provide feedback during the design phase, prior to the award of the construction contract
Project Features
Provide a comprehensive emergency communication system (ECS) upgrade and modernization including replacement of existing emergency call stations, implementation of new IP-based devices, and integration with the district's network-based ECS platform.
- Remove and replace existing ECS devices identified on the drawings and in the owner-provided device inventory (refer to sheet ec701). Existing devices consist of a mix of legacy analog (Viking) and IP-based (Blazecast) emergency call stations.
- Provide new ECS devices at locations indicated on the drawings, including all required mounting hardware, backboxes, and accessories.
- Provide new infrastructure for all new and replacement ECS devices, including category 6A cabling, pathways, backboxes, and associated connectivity to support full system functionality.

Project Map

District Wide:
Mesa College - 7250 Mesa College Dr, San Diego, CA 92111
Miramar College - 10440 Black Mountain Rd, San Diego, CA 92126
City College - 1313 Park Blvd, San Diego, CA 92101
Continuing Education (multiple) - 4343 Ocean View Blvd, San Diego, CA 92113
Project News & Information
Additional resources, articles, and links related to this project will appear here when available. For comprehensive information about Measure HH and all ongoing projects, please explore the Measure HH website.
Project Teams
| General Contractor | TBD |
| Architect | N/A |
| Structural Engineer | N/A |
| Civil Engineer | N/A |
| Mech./ Elect. Engineer | Consulting Group |
| Executive Const. Manager | Jonathan Cruz |
Last updated: June 30, 2026